The furnace supplier can include the cooling tower and pumps with the line. If your factory already has a recirculating cooling-water pool and pumps, ask the supplier to check which equipment can be reused. Start by checking whether the tower and pumps are included in the total price. Also establish who buys and installs the pipes and valves between the factory water supply and the equipment.
Why does an oil-quenching line also need cooling water?
The workpieces are heated in the mesh belt furnace, enter the oil tank for quenching, and then pass through washing and tempering. Repeated loads of hot workpieces introduce heat into the oil, so the tank also needs heat removal. One roller-supported mesh belt furnace agreement from Jiangsu Suneng Industrial Furnace Co., Ltd. (Suneng) identifies three water-cooling users. In addition to the quench oil tank, the circulation fans and the bearing housings of the rollers supporting the belt need cooling. Having quench oil ready therefore still leaves a question for the inquiry: where will the cooling water come from?
Why does one line include new equipment while another reuses the existing water system?
One Suneng agreement includes an outdoor closed-circuit cooling tower, circulation pumps and a 304 stainless steel water tank in the supplier's scope. The pumps have a duty/standby arrangement: one operates and the other remains available as backup. The buyer supplies the factory-side make-up water pipes and valves, as well as the external piping from the pre-installed connection points to the equipment, and carries out the corresponding installation. In this arrangement, the tower and pumps are included, while the buyer still needs a budget for pipe connections.
Another roller-supported mesh belt furnace agreement uses a different arrangement. Both the cooling-water pool and circulation pumps are marked for reuse, again with one duty pump and one standby pump. Buyers with an existing water system can list the pool, pumps and equipment they already serve, then ask the furnace supplier to check what can remain in use and what needs to be added when the new line is connected.
When comparing prices, send both suppliers the same request. “Please mark which cooling tower, duty pump and standby pump are included in the total price. On the piping drawing, show where your connection work ends and which remaining section we must install.” Add the buyer's separate piping and installation costs before comparing the total cost of the two offers.
Website case · New closed-circuit cooling tower and circulation pumps https://www.jssngyl.cn/en/case/roller-belt-cooling-water-supply
Website case · Reusing the cooling-water pool and circulation pumps https://www.jssngyl.cn/en/case/roller-belt-stage-output
Telephone: 13052986814
Email: 997518512@qq.com
Technical authors: Suneng Industrial Furnace Engineering Team & Tang Li