The mesh belt quenching furnace is transported through the mesh belt, the workpiece suitable for belt loading is sent to the heating area, and then transferred to quenching and subsequent processes according to the specific unit configuration. The mesh belt is responsible for conveying, and each temperature zone provides the heating conditions required by the process; whether the workpiece can meet the requirements also depends on the material, belt loading, effective heating time, cooling and follow-up treatment.
All mesh belt furnaces cannot be understood as the same oil quenching line, and a unified process temperature cannot be given based on the number of power or subdivisions alone. This article explains the judgment conditions of procurement and fault communication, and does not provide operating instructions for belt threading, hot belt replacement, water leakage treatment or parameter modification.
Is this a single furnace or a multi-stage line?
Continuous heating, protective atmosphere treatment, and quenching, cleaning and tempering connection may be configured differently. When purchasing, first list what equipment the workpiece goes through from feed to discharge, and how the adjacent processes are connected, and then compare the quotation range.
Workpiece must be suitable for tiling or controlled stacking on the mesh belt. Easy card net, rolling, serious stacking or workpiece that requires a special material plate cannot be determined to be suitable just because the size is small; the corresponding conveying scheme should be compared through the workpiece and belt loading conditions.
Set belt speed, heating length and process time together
In the corresponding effective heating section, the speed of the mesh belt increases, which will shorten the passage time of the workpiece. Therefore, increasing the speed cannot be directly equivalent to increasing the accepted output; it is also necessary to check the belt loading status, temperature zone conditions, heat load and upstream and downstream cycle time.
The process temperature should be determined by the material, quality target and the corresponding process basis. How to allocate the temperature zone should be confirmed in combination with the specific furnace type, loading and verification requirements, and the set value of another furnace cannot be copied. The installed power cannot prove alone that a certain steel piece can be processed and qualified.
Match each issue to the relevant documents
| Problems encountered | What to sort out first? | Conclusions that cannot be drawn directly based on this |
|---|---|---|
| I want to confirm whether the workpiece is applicable. | Material, shape, single piece quality, belt loading and target quality | Small parts or enough power must be suitable. |
| Insufficient output or fluctuation of results | FEEDING, SPEED, EFFECTIVE LENGTH, TEMPERATURE ZONE AND COOLING RECORD | Speeding up can increase accepted output. |
| Mesh belt delivery abnormality | Equipment structure, phenomenon location, load and maintenance records | All furnace models adopt the same belt threading or adjustment method. |
| I don't know how to set the temperature zone. | Material process basis, equipment partition and verification record | If the number of subdivisions is the same, the temperature can be copied. |
| There is an abnormality in the cooling system | Actual cooling structure, alarm and existing inspection records | If the abnormality disappears temporarily, it means that the system is normal. |
For specific measurement, maintenance or parameter adjustment, the person in charge shall check the documents of the machine and the applicable work procedures. In the absence of this part of the basis, the information table in this article cannot replace the on-site disposal plan.
Assess equipment performance separately from product results
Equipment operation records, temperature records and workpiece quality inspection have their own corresponding objects. Mesh belt can be transported continuously, which cannot prove that the workpiece has not collided, is not deformed or is fully qualified; replacing a part cannot automatically prove that the performance of the whole line has been restored.
The technical agreement should list the actual test workpiece, belt loading method, process conditions, equipment records and workpiece judgment requirements. When comparing the production capacity or the effect before and after processing, use comparable working conditions and indicate which conclusions come from equipment testing and which from workpiece verification.
When preparing for consultation, give the workpiece, process, belt loading, target cycle time and abnormal record first. Can be combined Mesh belt furnace equipment and configuration boundary Catch up Maintenance and renovation services for industrial furnaces Confirm what information is needed in the next step, and do not promise the specific processing effect when the information is insufficient.