Mesh belt furnace supporting oil smoke and exhaust gas purification. First, it is necessary to clarify which section the smoke comes from, under what working conditions, what the existing collection and discharge system is like, and then compare the treatment equipment. Only report "for mesh belt furnace" or only select a certain name of electrostatic and plasma, which cannot determine the scheme, let alone prove the emission result.
This article is used to sort out procurement information. It does not provide the safety design and operation steps of the purification system, and does not say that a certain type of purifier is applicable to all heat treatment lines.
Identify the source at the actual process stage
The mesh belt furnace can be a single-stage heating equipment, or it can be connected to processes such as quenching, cleaning, tempering and cooling. What processes and positions on the project need to be collected and processed should be confirmed one by one according to the actual equipment, and the whole line should not be regarded as a flue gas source.
Put the location of occurrence, the corresponding process, production load and the existing collection method together, so that the supplier of the processing equipment can judge whether the information is sufficient. When the data is missing, first clarify what on-site investigation or testing is needed; the composition and processing capacity cannot be determined by the color of the flue gas or the sentence "the oil smoke is very large".
Compare treatment options against the evidence and site interfaces
The applicability of different treatment routes should be confirmed in combination with the existing exhaust gas information, operating conditions, maintenance conditions and risk assessment of the project. The name of the equipment, the material of the filter element or the material of the shell cannot replace the complete scheme alone.
When there are already pipes, fans, collection covers and discharge ports, it should be written which reservations, which are added, and who will check the supporting conditions. Only buy the processing host, but there is no clear collection end and connection range. The quotation looks cheap, and there may be work that is not included on site.
| The information provided first | What is used to judge? |
|---|---|
| Equipment list, actual process and flue gas appearance location | Do you need to check different sources separately? |
| Workpiece, production cycle time, used medium and existing test records | Whether the plan is based on the actual operating conditions |
| Existing hood, pipe, fan, discharge information | Who is responsible for the retention, addition and connection work? |
| Installation space, public conditions and maintenance arrangements | Whether the equipment can be connected and whether the maintenance work can be carried out |
| Emission requirements and acceptance responsibilities confirmed by the project | How to agree on the test object, working condition, method and delivery evidence |
The protection design involving risks shall be confirmed by the corresponding responsible personnel according to the actual equipment and project conditions. This article does not provide general practices for fire prevention, gas treatment or system commissioning.
Distinguish equipment delivery from emissions acceptance
The completion of equipment installation, fan operation or visual flue gas reduction only indicates part of the status respectively. If the contract stipulates the discharge results, it should be clearly written in which position, under what production conditions, and by who according to what project requirements, and keep the corresponding records.
At the same time, the working boundaries of the equipment supplier, the on-site supporting party and the testing party are listed. You can't use the sentence "with a purifier to meet the standard" instead of the testing and acceptance requirements of the project.
Direct each question to the responsible party
For the interface problem of industrial furnace and whole line, you can first sort out the workpiece, process, equipment arrangement and existing supporting materials, combined with Mesh belt furnace equipment and whole line boundary Communicate. The specific selection, supply and emission testing of purification equipment should be confirmed by the undertaking unit and the scope of responsibility in the project respectively.
This article does not declare that Suneng independently manufactures electrostatic or plasma purifiers, nor does it make a commitment to the treatment capacity of certain pollutants or emission standards.