In one nitrate-salt austempering line agreement from Jiangsu Suneng Industrial Furnace Co., Ltd. (Suneng), the main furnace belt is 500 mm wide and the agreed whole-line throughput for small and medium-sized metal parts is approximately 300 kg/h. For your own parts, even with the same main furnace belt width, the loading arrangement and residence times in the furnace and salt bath need to be checked before determining hourly throughput.

Follow the workpieces to distinguish the two belt widths

Workpiece locationWhat this project's agreement specifiesWhat to check when buying
Heating in the upstream quenching furnaceMain furnace belt width 500 mm, heated section length 4700 mmUse these dimensions to compare the main furnace
Entering the nitrate-salt bathElevator belt width 900 mm, with workpieces travelling on the belt under the salt surface for 3–15 minutesThese describe the in-tank conveying width and submerged travel time
Washing after the bathThe elevator belt carries parts out of the nitrate-salt bath and into the washerCheck whether post-bath washing is included
Entire line, from quenching furnace through nitrate-salt bath to washingAgreed throughput approximately 300 kg/hConfirm which final process stage the quoted throughput covers
Approximately 300 kg/h for this whole line. Check the two belt widths. Main furnace belt; 500 mm; Heating inside the furnace.. Salt-bath elevator belt; 900 mm; Submerged travel: 3–15 minutes.. For small and medium-sized metal parts. The complete line includes washing after the bath.

The workpieces are heated in a protective atmosphere, enter the nitrate-salt bath, and are lifted out for washing. The 3–15 minutes in the table cover only travel on the belt beneath the salt surface. An auxiliary tank beside the bath is used for salt-liquid exchange.

Can you accept an order at this rate if another supplier also quotes a 500 mm belt?

Belt width alone is insufficient for promising an hourly delivery weight. Ask the supplier to use your drawings to identify the part specification, loading arrangement and required residence times in both the furnace and salt bath. Then ask for the throughput measurement endpoint to be marked on the process diagram. The two quotations can be compared meaningfully once both identify the workpieces, process conditions and treatment scope.

Website case · Nitrate-salt austempering line for small and medium-sized metal parts https://www.jssngyl.cn/en/case/overseas-austemper