2017 and 2026 roller-supported normalizing and tempering lines
The 2017 normalizing and tempering widths were 800 and 1000 mm. The 2026 design used 1000 and 1200 mm respectively. In both, 950°C and 650°C are furnace-section ratings.
Engineering guide
Match the workpiece, process and target output with heating, cooling, handling and control systems.
Discuss Your RequirementsStart with the material, workpiece dimensions, required treatment and target output. Then coordinate loading, heating and holding, cooling or quenching, downstream treatment and controls. Capacity must be checked against the actual workpiece, loading pattern, process time and upstream and downstream equipment.
Each set of figures belongs to the source project. Confirm the working zone, workpiece, loading and acceptance conditions independently.
The 2017 normalizing and tempering widths were 800 and 1000 mm. The 2026 design used 1000 and 1200 mm respectively. In both, 950°C and 650°C are furnace-section ratings.
The 2020 RCWT-360/220-9/6 had 850/1000 mm working widths and 30–250 mm/min quench-belt speed. The 2026 RCWT-250/200-9/6 used 800/1000 mm and 50–300 mm/min in both furnaces. The 950/650°C figures are unit ratings rather than part temperatures.
The RCWT-75/45-9/6 quench and temper zones were 400 × 3200 and 400 × 5600 mm. With a 0.4 m belt, 0.25 m/min and an assumed loading of 25 kg/m², the design reference is 150 kg/h. Change the part or loading and the result changes.
The 9300 × 1000 × 100 mm usable heating section was rated at 300 kW and up to 950°C. The power covers that section alone. Actual daily output depends on loading, belt speed and runtime.
The 850 mm (2021) and 1250 mm (2024) proposals both specified one preheat section, four heating sections and eight combustion-control zones. A 700–1200°C process range and cooling below 80°C were project requirements.
Two furnaces each had a 2500 × 1600 × 800 mm working zone and four 250 kW-class low-NOx burners. Approximately 1000 kW per furnace is combustion input. Air preheat to 200–300°C was a design target; NOx is subject to site testing.
The furnace section was about 110 m, including about 25.6 m preheating and 84.4 m heating and soaking. With water cooling, squeezing, drying and transitions the process section was about 125.4 m. Compare the same boundaries when planning floor space.
850 mm was the nominal line size. The source design covered strip 480–750 mm wide and 1.6–4.0 mm thick at 1050–1150°C. The furnace body was about 130 m, with a design thickness–speed product of about 190 m·mm/min.
A continuous line is worth evaluating when the product mix and process route are relatively stable and production is sustained.
For varied products, small batches or frequent recipe changes, compare batch furnaces as well. Loading constraints and available floor space also affect the choice.
Continuous furnaces move workpieces at a set speed or indexed cycle; batch furnaces process one load at a time. Either type can use automatic loading and unloading and form part of a production line.
These are process examples. Cleaning and drying depend on the medium and process; the final route depends on the material and handling method.
Load or uncoil → heat and hold → cool as required by the process → unload or recoil.
Load → heat and hold → quench → clean and dry where required → temper → cool and unload.
Uncoil → heat and hold for the specified solution treatment → cool at the rate required by the material and process → recoil. Confirm the material grade, strip width and thickness, holding conditions and cooling requirements.
Confirm dimensions, weight, loading pattern, required hourly output and shifts. Check heating time and the ability of upstream and downstream equipment to keep pace; furnace size alone does not establish capacity.
Select heating and temperature zones, cooling or quenching, and conveying around the workpiece and process. Coordinate transfer timing and downstream treatment.
Define automation interfaces, process records and protective functions together with the equipment configuration. Agree how each interface will be checked.
List the furnace, conveyors, cooling and controls included in supply. Identify site utilities and the responsibilities of each party. Suneng participates as an equipment supplier or equipment subcontractor within the agreed contract scope.
Agree the workpiece, material, loading pattern and process used to verify product quality and throughput. A design capacity or proposal value is not a measured production result.
Agree temperature measurement, trial operation and applicable acceptance items, together with drawings and operating documentation. Civil works, pressure vessels, regulated equipment and wider environmental or general contracting work require appropriately qualified parties.
Use these equipment pages as selection references, then confirm the configuration for your workpiece and process.
Yes. Start with workpiece photographs, the known material, target output and treatment requirements. Mark unknown items as unknown so they can be clarified.
By checking workpiece dimensions and weight, loading pattern, process time, and upstream and downstream equipment. It cannot be determined from furnace dimensions alone.
No. Batch furnaces can also form automated lines. Compare the product mix, process changes, loading method and site conditions before choosing.
Based on Suneng’s existing Chinese engineering guide. Project examples retain their original design and acceptance limits. English content updated .
Discuss your project