When does annealing soak time start? Why furnace temperature alone is insufficient for a coil
Use the timing basis in the process specification. Where soaking starts at material temperature, check the agreed representative workpiece measurement. Where a loaded furnace programme has been validated, confirm the load remains within its range before changing the hold.









