Yes. Jiangsu Suneng Industrial Furnace Co., Ltd. supplied equipment for the annealing furnace and solution-treatment cooling section of a customer’s continuous stainless steel strip annealing and pickling line. Suneng’s thermal-section scope included the furnace, cooling section, combustion equipment and controls. Separate equipment performs downstream pickling.
Which strip dimensions does the project design cover?
The 850 mm in the line name is its nominal size. The strip dimensions and process conditions in the technical annex provide a more useful basis for procurement.
| Item | Design conditions in the project technical annex |
|---|---|
| Material | 200- and 300-series stainless steel strip |
| Strip width | 480–750mm |
| Strip thickness | 1.6–4.0 mm |
| Strip annealing temperature | 1050–1150℃ |
For example, an 800 mm strip is narrower than the nominal 850 mm but wider than the design maximum of 750 mm in this proposal. Reassess the usable furnace passage, roller support and cooling coverage before considering that width.
How does the strip pass through heating and cooling?
In the project design, the strip runs continuously through preheating, rapid heating and soaking. The heating furnace has a design length of approximately 130 m. The strip then enters the solution-treatment cooling section for staged cooling, squeezing and hot-air drying before downstream handover. The cooling and drying section accounts for a further approximately 45 m. Allow space for both sections in the plant layout.
One easily missed interface is the strip temperature at handover. The strip passes through a hot-air dryer after water cooling. The technical annex notes that the dryer can reheat the strip at low line speeds. If the downstream process limits entry temperature, agree to check it at the dryer outlet. The strip annealing project description sets out the sections and supply boundaries.

What information is needed to assess another strip product?
List both the common specifications and the most demanding ones. For each, provide material grade, width, thickness, required line speed and annealing temperature. In a furnace section of fixed length, faster strip travel gives a shorter residence time. Assess thickness, target strip temperature and speed together when checking continuous capacity.
To fit a furnace into an existing line, provide a site layout showing the strip entry, downstream handover and existing cooling and drying equipment. This allows both parties to identify new equipment and the interfaces to be connected to the existing line.
Telephone: +86-130-5298-6814
Email:997518512@qq.com
Technical author: 苏能工业炉工程技术团队&唐荔 (Suneng Industrial Furnace Engineering Team & Tang Li)