The coil count cannot be obtained by dividing 7.5 tonnes by the weight of one coil. A Jiangsu Suneng Industrial Furnace Co., Ltd. proposal for an electric chamber annealing furnace with a fork charging car specifies a maximum of 7.5 tonnes including the rack and charge. Deduct the rack weight, then check how many whole coils fit on the loading drawing. Both limits apply.
This 2023 proposal concerns a different furnace from the four-chamber copper-wire contract in this series. The former allows 7.5 tonnes per batch and the latter 5.5 tonnes. Both figures include the rack.
Calculate the maximum number of coils by weight
For equal-weight coils of one size, divide (7.5 tonnes minus the total rack weight) by the net weight of one coil and round down. Compare that number with the positions available on the loading drawing. Plan for the lower number. For mixed coils, add their individual weights and check each position.
Three figures that apply to different things
| Item | Specified condition | How to use it |
|---|---|---|
| 7.5 tonnes per batch | Maximum proposed charge including material and rack | Check the total loaded weight. |
| 10-tonne fork rating | The proposal’s fork-load entry gives 10 tonnes and notes an actual load of 7.5 tonnes | The nominal fork rating does not increase the permitted copper charge. |
| Chamber: 2.4 m × 2.5 m × 1.8 m | Effective chamber dimensions | Use the effective loading space and rack drawing to lay out the coils. |
After deducting the rack weight, do the coils physically fit?
For example, assume a 0.7-tonne rack and 0.8 tonnes net per coil. The weight limit allows 8 coils, or 7.1 tonnes including the rack. A ninth would bring the load to 7.9 tonnes. If the agreed drawing provides only 6 positions, plan for 6 coils or 4.8 tonnes of copper alloy. These weights and quantities are illustrative.

Loading route: weigh coils and rack → arrange coils at the loading station → transfer the rack into the chamber → move it to the unloading station after annealing.
Calculate net charge and shift output separately
The proposal allows 3 hours for heating and 5 hours for soaking. The sum of 8 hours covers those two stages only. To calculate coils per shift, also account for loading, unloading, waiting, product changeovers and any other occupancy. Record the net batch weight and the times of charging, readiness for unloading and actual unloading.
Coils with the same outside diameter can still differ in width, bore and weight. At enquiry, check the largest envelope and the heaviest coil separately. Either available rack positions or the gross weight limit can govern.
Would a lighter rack allow one more coil?
Only if weight currently governs and an entire additional coil fits in the layout. The designer must verify any rack change. Give Suneng the coil outside diameter, width, net weight and rack drawing so that the weight and space limits can be checked separately.
Sources: 2023 electric chamber annealing furnace proposal, sections 2 (equipment), 3 (design parameters) and 4 (charging car). The 5.5-tonne figure comes from the 2020 four-chamber contract and Suneng’s load clarification. The numerical coil example is hypothetical.
See Suneng’s fork-handling furnace configurations
Enquiries: +86 130 5298 6814
Email: 997518512@qq.com
Technical authors: Suneng Industrial Furnace Engineering Team and Tang Li