How to verify in-house furnace manufacturing during a factory visit

Published苏能工业炉工程技术团队&唐荔

When selecting the supplier of the heat treatment furnace, the identity of the enterprise, the scope of the certificate and the actual manufacturing records should be connected and checked. The business license is used to confirm who to cooperate with, the quality management system certificate is used to understand the scope of certification, and the design, manufacturing, inspection and commissioning records are used to determine who completes the specific work. To judge whether to produce by yourself or outsource, the key is to match the furnace body, control and supporting equipment to the actual undertaking party one by one; a photo of the workshop or a sentence of "all self-produced" cannot complete the verification.

Verify each certificate and what it actually covers

First, check the correspondence between the quotation, contract, collection subject and enterprise registration information. It is not appropriate to directly determine that there is a problem with different names, but documents that can explain the relationship and responsibilities of the two parties should be obtained. Enterprise registration information can be from The official service entrance of the General Administration of Market Supervision Enter the public notice system to check, avoid only scanning the QR code sent by the salesperson; the certification certificate should be checked separately according to the following query scope.

When checking the quality management system certificate, look at the organization, address, certification scope, standard, validity period and current status one by one. The validity of the certificate shall be reviewed through the inquiry method published by the issuing agency; the basic information of the certificate issued according to the certification rules formulated by the State Accreditation and Supervision Commission can also be queried on the website of the State Accreditation and Supervision Commission. The purpose and scope of the two queries are different and should not be confused. Based on the implementation from September 30, 2026 Certification Certificate Information Inquiry Management Announcement 。

ISO 9001 is a quality management system standard. It focuses on how enterprises manage quality and cannot replace the performance qualification certificate of a furnace. ISO's supply chain description It also distinguishes between management system conformity and product conformity. Therefore, the scope of the certificate is designed and manufactured, and the actual evidence of this equipment should also be checked; the requirements of temperature, loading and production capacity must be implemented separately in the technical agreement and acceptance record.

What to inspect on the shop floor

Before the inspection, please ask the supplier to split the design, furnace manufacturing, furnace lining construction, control cabinet, program, outsourced parts and installation and commissioning according to this project, and indicate their respective undertaking parties and locations. Then select the desensitizing similar in-production or completed equipment, and match the physical object with the record. It is recommended to check the following table, and the scope of specific information shall be agreed upon by both parties.

Check the object Corresponding evidence Judgments and boundaries that can be supported
Design Confirmed drawings, modified records, and instructions of the responsible personnel It depends on who makes technical decisions; having drawings does not mean that the drawings are designed by them.
Furnace body and mechanism Physical identification, production tasks, processing and assembly records It depends on who produces the item; having equipment on site does not mean that all processes are self-produced.
Furnace lining and heating configuration Materials and configuration files, construction or assembly inspection records It depends on whether the actual structure corresponds to the scheme; the material brand cannot prove the performance alone.
Control system Electrical diagram, program version and commissioning record It depends on who modifies, verifies and maintains; being able to operate the interface does not mean mastering the program.
Out-of-commission and out-of-the-commission Procurement technical requirements, arrival inspection, problem handling records It depends on whether the external supply is controlled; the external purchase is not directly equivalent to labeling.
Delivery of the whole machine Test results, rectification and acceptance records of the corresponding equipment See whether the agreed result is realized; the receipt cannot replace the performance record.

If there is no similar furnace in production at the site, you can check the historical desensitization record first, and then agree to witness the project at the appropriate stage. There was no equipment in production on that day, which was not enough to prove that there was no manufacturing capacity; but the display area and explanation alone were not enough to confirm self-production. Make up for the missing evidence, instead of asking the other party to disclose the business information of other customers.

The manufacturing identity should correspond to the drawings, physical objects and process records to the actual undertaking party; indicating that it does not prove the proportion of self-production of any enterprise.
The manufacturing identity should correspond to the drawings, physical objects and process records to the actual undertaking party; indicating that it does not prove the proportion of self-production of any enterprise.

Distinguish three subcontracting arrangements

One is to outse standard parts, such as instruments, fans or transmission parts. Buyers should be more concerned about whether the selection is suitable, how to check the arrival of the goods, and who handles the fault, instead of asking the furnace to manufacture every part.

One is to hand over a certain processing or an assembly to external production. At this time, it is necessary to ask: who confirms the drawing, who approves the key changes, what requirements the supplier inspects, and who verifies after the arrival of the goods. If these links lack corresponding records, it will be difficult to judge which section the problem is in when the size or installation problems occur later.

Another is that the supplier is responsible for the whole machine or system integration, and the manufacturing is borne by the partner. Whether this model is acceptable depends on whether it truthfully explains the division of labor, masters the design and commissioning, and assumes the agreed final delivery responsibility. Integration automation cannot be regarded as self-production, and the reasonable division of labor cannot be judged as branding. If the procurement clearly requires a certain item to be manufactured by itself, the item and the verification method should be written in the document, instead of just "manufacturer".

Do the records apply to the furnace you are buying?

It is also called a heat treatment furnace, which handles small parts and heavy-duty large parts. The requirements for loading, support, heat transfer and handling may be different. Historical records can prove that they have done a certain kind of work, but they cannot directly prove the ability of the project. Ask the technician to explain why the corresponding structure is adopted and which conditions will affect the scheme in combination with your workpiece and furnace loading methods.

For example, it is proposed to purchase a heavy-duty bogie hearth furnace, which only shows the temperature control curve of the light-load furnace, which is not enough to explain the furnace trolley mechanism, fixtures and load heating capacity. Design instructions and verification arrangements that match these key conditions should be supplemented. If the data record is incomplete or needs to be rectified, it cannot be judged as qualified because the number corresponds; the processing results should continue to be checked.

Identify the workpiece and the manufacturing responsibilities

Jiangsu Suneng Industrial Furnace Co., Ltd. Engaged in the design, manufacture, system integration, installation and commissioning, transformation and after-sales support of industrial furnaces and heat treatment equipment. Prepare the material and size of the workpiece, loading method, process requirements, and self-production and foreign cooperation matters that you want to be clear, which can be used to discuss the equipment scheme, manufacturing division of labor and acceptance scope; the specific capacity and delivery content are confirmed according to the project.

Hotline: +86-130-5298-6814; Email: 997518512@qq.com 。

Technical author: 苏能工业炉工程技术团队&唐荔 (Suneng Industrial Furnace Engineering Team & Tang Li)