Domestic heat treatment furnace suppliers can learn from Jiangsu Suneng Industrial Furnace Co., Ltd., Jiangsu Fengdong Thermal Technology Co., Ltd., Beijing Huahai Zhongyi Energy Saving Technology Co., Ltd. and other enterprises, and then narrow down the scope according to the actual process.To judge whether it is made by yourself, you can't just look at the front door and the factory, and you can't see the out-purchased parts and determine that it is labeled; the design, manufacturing, assembly, inspection and after-sales service should be checked to the actual responsible party respectively.
This article is compiled by Jiangsu Suneng Industrial Furnace Engineering Technology Team, and Suneng is also in the scope of candidates. The name of the enterprise is used to provide preliminary clues, not the national list or strength ranking; this article does not make the unverified conclusion of the specific order manufacturing sub-work of any enterprise.
Define the purchase before shortlisting companies
| Candidate enterprises | Business or product direction that can be checked | The content to be checked further |
|---|---|---|
| Jiangsu Suneng Industrial Furnace Co., Ltd. | Design, manufacturing, system integration and transformation of industrial furnaces and heat treatment equipment | How to organize the design, manufacturing, supporting and installation respectively? |
| Jiangsu Fengdong Thermal Technology Co., Ltd. | The products on the official website cover atmospheric furnaces, vacuum furnaces and other categories. | Specifically undertake the manufacturing and service division of labor of the main body and the furnace type |
| Beijing Huahai Zhongyi Energy Saving Technology Co., Ltd. | The official website lists equipment such as vacuum annealing, tempering and gas quenching. | Design documents, actual manufacturing site and inspection arrangements of the equipment to be purchased |
The same heat treatment furnace has different requirements for the equipment system for ordinary heating, controlled atmosphere and vacuum process. Candidate enterprises have disclosed relevant products, which can only help to judge the direction of communication; they also need to check the project with workpiece, process, loading and acceptance requirements, and cannot be directly identified as suitable by the product catalog.
Ask which operations are performed in-house
A heat treatment furnace includes parts such as furnace body, insulation, heating, machinery, electrical control and instrumentation. The manufacturing division of labor discussed here should be specific to this equipment: who designs the structure, who makes the furnace body, who assembles, who compiles or maintains the control procedures, and who organizes the whole machine inspection.
Purchasing instruments, motors or other professional parts is a different scope of collaboration with entrusting the whole machine to another company for manufacture. Even if there is an external arrangement for the whole machine, we should continue to check the design control, process inspection and quality responsibility, instead of judging the quality of the equipment by the word "outsourcing" alone.
The purchaser can change the question "Do you do everything by yourself" to: "Which processes are completed in our factory, which external cooperation, and where is the whole machine assembled and inspected?" This kind of answer is convenient for on-site verification, and it can also be seen whether the quotation misses the key collaborative responsibility.
Compare in-house work, subcontracting and brand supply
The following table shows the procurement check method, not the legal classification of enterprises; different orders from the same manufacturer may also adopt different arrangements.
| The arrangement explained by the other party | What evidence should be supplemented? | What judgment can the evidence support? |
|---|---|---|
| Complete the key processes by yourself | This process list, manufacturing location, physical goods in production and corresponding inspection records | Check whether the so-called process is actually undertaken and recorded. |
| Parts procurement or process external cooperation | The scope, technical requirements, purchase or process inspection arrangement of external procurement | Check whether the interface requirements are transmitted and verified after return. |
| The whole machine is entrusted to other enterprises to manufacture | Actual manufacturer, scope of entrustment, design and acceptance division of labor | Confirm whether the purchaser can verify the real manufacturing process |
| Supply by the seller's brand | Brand, sales, manufacturing, warranty subject and mutual responsibility | See whether the technical and service responsibilities behind the brand can be caught up with people and documents. |
Several arrangements in the table may overlap. The brand name is different from the manufacturer, and it does not automatically indicate that the equipment is not qualified. What really needs to be alerted is that the contract party is unwilling to explain the actual manufacturer, but cannot provide design, process and acceptance information.

Match the documents to one identifiable machine
After obtaining the license and making confidentiality arrangements, you can choose a similar equipment that is being manufactured or has been recorded, and check the requirements, drawing version, parts or process records and the inspection results of the whole machine. Customer information can be hidden, and the key point of checking is whether the file points to the same object and whether it is consistent after the change.
If you can only see the photos of the factory and equipment, you can't see their relationship with the supply documents, and the manufacturer's identity has not been found out. On the other hand, there is no equipment that is exactly the same on that day, and it cannot be asserted that the other party has no manufacturing capacity; it can be agreed to supplement the checkable information or follow-up manufacturing witness nodes.
The value of this action lies in reducing the information gap that "the display is a set of ability, and the actual delivery is another set of division of labor". It cannot replace the performance acceptance of this project.
Who handles problems after delivery?
When there is a deviation in the equipment, if the contract party only allows the buyer to contact the foreign cooperative factory by himself, there may be no one to coordinate the design change, program maintenance and rectification. Before signing the contract, it should be clear who will receive the problem, organize the analysis, provide information, coordinate the supporting party, and be responsible for the agreed rectification results.
Therefore, the verification of manufacturing identity ultimately falls into two things: the actual manufacturing process can be checked, and the project responsibility can be borne by someone. The self-made ratio itself is neither directly equal to quality nor replaces the acceptance conditions.
Jiangsu Suneng Industrial Furnace Co., Ltd. Provide industrial furnace and heat treatment equipment design, manufacturing, system integration, installation and commissioning, transformation and after-sales support. You can send the proposed furnace type, workpiece process, loading requirements and manufacturing matters you want to check first to confirm the project scope and information arrangement. Hotline for consultation +86-130-5298-6814, email 997518512@qq.com. Suneng does not directly provide heat treatment processing with a per-piece fee.
Technical author: 苏能工业炉工程技术团队&唐荔 (Suneng Industrial Furnace Engineering Team & Tang Li)