Parallel round bars laid across the furnace

Long-bar quenching across a 6 m working width

Suneng’s fork-handling furnace carries long bars parallel to the furnace door. A charging car lifts the complete batch between the hearth supports. The agreement permits no more than 30 seconds from first outward movement to full immersion with 5 tonnes of workpieces.

Working width
6 m
Workpiece weight for the timed transfer
5 t
Withdrawal to full immersion
≤30 s

The bars run parallel to the door. The working width also includes clearance at both ends.

Project features

A wide doorway for transverse loading

The bars rest across the supports parallel to the door along the 6 m working width. The forks enter between the supports and lift the batch together.

Quenching the entire batch outside the furnace

After the door opens, the rail-mounted car lifts the bars out, moves them to the tank and lowers them. The bars retain their transverse orientation.

Equipment arrangement and process sequence

Full-line process flow

Select a process card to view its animation

Equipment specifications

ItemProject specification
ModelRX4-850-12 high-temperature chamber furnace with fork handling
Heating and control zonesResistance heating, 850 kW, 4 zones
Maximum operating temperature1200 ℃
Furnace temperature uniformity during soaking±8 ℃
Working zone (length × width × height)1.3 × 6 × 0.6 m
Load and transfer5 tonnes of workpieces excluding support blocks. Maximum withdrawal-to-immersion time: 30 seconds.

Supply responsibilities

Suneng
Provides foundation construction information, installs and commissions the equipment, and trains operators.
Buyer
Supplies the water-quench tank and heat-resistant steel basket, prepares the installation site to the foundation drawing and assists with water, electricity, gas and lifting equipment.

Scope of supply

Suneng supplies the resistance-heated chamber furnace, door and lift, rail-mounted fork car and electrical controls. The furnace heats in zones. The car lifts and transfers the entire batch.

Acceptance procedure

Factory inspection before dispatch
After manufacture, the agreement calls for the buyer to inspect assembly quality, safety items and associated equipment at the factory.
Loaded commissioning on site
Cold commissioning precedes heating under load. The acceptance criterion is compliance with the contract’s technical requirements.
Transverse loading and batch immersion

Lay the bars parallel to the furnace door. With the door fully open, start when the batch first moves out. The last bar is fully submerged. Agreement: a maximum of 30 s for 5 tonnes of workpieces.

Transverse loading and batch immersion

Transverse loading and batch immersion
Open original in a new window

Common questions

Working width, timing full immersion and responsibility for the tank.

Is 6 m the chamber depth or the width along the door?

It is the working width along the door. The working depth is 1.3 m and the working height is 0.6 m. The bars lie across the width.

What do the 5 tonnes and 30 seconds refer to?

The 5 tonnes is workpiece weight excluding the support blocks. With the door fully open, time from first outward movement until the complete batch is submerged.

Who supplies the quench tank and handling equipment?

The buyer supplies the tank. Suneng supplies the rail-mounted fork car. The interfaces include the tank opening, track and clearance for lowering the forks.

Reference: 2023 contract and technical agreement for the high-temperature chamber furnace for long bars. Load and timing definitions follow Suneng’s published product information.