Two gas-fired furnaces and two enclosed cooling boxes share one fork charging car
One car moves each batch from a Suneng gas-fired furnace to a free cooling box. The line has two furnaces and two enclosed boxes. The quoted supply includes five sets of heat-resistant trays with two pieces per set.
- Gas-fired heating furnaces
- 2
units - Enclosed cooling boxes
- 2
units - Shared fork charging car
- 1
units
The equipment quantities come from the technical agreement for the line.
Project features
Heating and cooling occupy separate stations
The car moves a batch from the furnace to a free cooling box. While it cools, the furnace can receive another batch.
One car serves the line
The two furnaces and two boxes share one car. Schedule a free box and time for the transfer before discharging the next batch.
Equipment arrangement and process sequence
Full-line process flow
Select a process card to view its animation
Equipment specifications
| Item | Project specification |
|---|---|
| Line configuration | Gas-fired heating furnaces with enclosed cooling boxes |
| Heating stations | 2 gas-fired heating furnaces |
| Cooling stations | 2 enclosed cooling boxes |
| Charging and unloading equipment | 1 fork car shared between heating and cooling stations |
| Working dimensions per furnace | 2.5 m long × 1.6 m wide × 0.8 m high |
| Control zones and burners per furnace | 2 temperature zones and 4 gas burners rated at 250 kW each |
| Heat-resistant steel trays | 5 sets with 2 pieces each, supplied by Suneng and included in the quotation |
Supply responsibilities
- Suneng
- Supplies furnaces, cooling boxes, the fork car and five sets of trays. Assists with loaded commissioning and performance checks.
- Buyer
- Provides trial billets, utilities and consumables. Both parties agree the quantity, quality and dimensions of the trial charge.
Scope of supply
Suneng supplies two gas-fired furnaces, two enclosed cooling boxes and one charging car. The quotation includes five sets of heat-resistant steel trays with two pieces in each set.
Acceptance procedure
- Agree the trial charge first
- Both parties specify the trial charge. The buyer supplies the agreed material.
- Two trial batches
- The agreement requires two trial batches and compliance with the performance criteria. The number refers to batches tested.
Heat the batches before transfer to enclosed cooling. The same car transfers batches between both furnaces and both boxes. A box can take the next batch after the cooled batch is removed.
Common questions
Shared handling, the interval between batches and trial conditions.
How many fork cars and trays serve the two furnaces?
One car and five sets of heat-resistant steel trays. Each set comprises two pieces. The trays are included in Suneng’s quoted supply.
Can the hourly intake be calculated from the number of boxes?
Two boxes provide two cooling positions. Intake intervals also depend on cooling occupancy and loading and unloading time. See the related scheduling article for an example.
Who provides the billets and how many batches are tested?
The buyer provides billets, utilities and consumables. Both parties agree the charge, run two trial batches and check the specified performance.
Reference: 2020 gas-fired production-line technical agreement. Furnace parameters are on p. 4; trial conditions are in the acceptance terms. Suneng’s engineering records confirm the tray quantities, supplier and inclusion in the quotation.