Copper-alloy wire coils laid flat

Four copper-alloy wire annealing chambers served by one fork charging car

One car loads and unloads Suneng’s four independently controlled annealing chambers. There is one loading and one unloading station. The maximum charge per chamber is 5.5 tonnes including coils and rack.

Independent furnace chambers
4 chambers
Heating power per chamber
200 kW/chamber
Coils and rack combined
5.5 t/batch

Each chamber has one temperature zone. A shared fork car connects the separate loading and unloading stations outside the chambers.

Project features

Four independently controlled chambers

The rack enters the designated chamber. Each chamber has its own heating zone. While one is being loaded or unloaded, the others can continue heating or soaking.

One car, separate stations

Incoming coils wait at the loading station. Annealed coils go to the unloading station. The contract lists one car for the four chambers and both stations.

Equipment arrangement and process sequence

Full-line process flow

Select a process card to view its animation

Equipment specifications

ItemProject specification
Equipment listed in the contractFour-chamber electric annealing furnace
Effective load dimensions in the contract1,700 mm diameter × 1,600 mm high
Heating power and zoning200 kW per chamber, one zone per chamber
Rated temperature / working range700 ℃ / 550–700 ℃
Working-zone temperature variation during soakingWithin ±5 °C
Batch load5.5 tonnes including copper-alloy wire coils and rack
Handling equipment1 fork car, 1 loading station and 1 unloading station

Supply responsibilities

Suneng
Designs, manufactures, installs and commissions the system. The contract includes a nine-point temperature instrument for checking differences within the working zone.
Buyer
Supplies the racks that enter with the coils and loads them under the supplier’s guidance during commissioning.

Scope of supply

Each chamber has its own hot-air circulation system and temperature control. One car travels between the loading station, chambers and unloading station.

Acceptance procedure

Empty and loaded commissioning
The contract separates the empty functional check from the loaded test with workpieces and racks.
Trial production period
The contract specifies 30 consecutive days of normal operation. Both parties then conduct acceptance under its technical and acceptance terms.
Four chambers share one charging car

Put the coils on the buyer’s rack. The charging car takes the loaded rack to a chamber. Each chamber has 200 kW of heating. All four share the same car. The car retrieves the annealed rack. Plan transfers against availability of the separate unloading station.

Four chambers share one charging car

Four chambers share one charging car
Open original in a new window

Common questions

Power per chamber, gross charge including racks and the four-chamber handling route.

Does 200 kW per chamber mean 200 kW for the whole system?

200 kW is the heating power of one chamber. There are four chambers, each with one zone.

Does the 5.5-tonne batch include the rack?

Yes. Deduct the actual rack weight from the combined coil-and-rack weight to obtain the net copper charge.

Is there a car for each chamber?

One car serves all four. It takes a rack from the loading station to the designated chamber and moves the annealed batch to the unloading station.

Reference: 2020 purchase contract and technical terms for the electrically heated chamber annealing furnace. The load definition follows Suneng’s product information.