Shutdown history
Recover the last operating conditions, failure causes, unusual repairs and information about residual process media. Unknown shutdown history requires investigation before restoring the old operating sequence.
Engineering guide
Establish the equipment condition, complete corrective work and define the conditions for cold, hot and loaded verification.
Discuss Your RequirementsFirst establish why the furnace stopped, what records remain and its present condition. Inspect the structure, lining, energy supply, electrics, temperature measurement, interlocks and mechanical systems. Define cold, hot and loaded checks, their prerequisites and any required test media in the project verification plan. The equipment documents and repair scope determine whether no-load heating is suitable and the order of testing. Meet the prerequisites for each test before starting it; a successful start does not prove readiness for stable production.
Recover the last operating conditions, failure causes, unusual repairs and information about residual process media. Unknown shutdown history requires investigation before restoring the old operating sequence.
Reconstruct missing drawings, program versions, circuits, nameplate information and safety logic. Establish a usable equipment record before testing.
Review component identification, transport deformation, foundations, alignment, pipework and wiring. The previous installation and acceptance records cannot replace verification at the new site.
Check shutdown history, insulation, seals, actuators, interlocks and energy supply. Original design capacity is not evidence of current loaded performance.
Restore component locations, alignment, foundations, piping and interfaces, then verify the new installation. Old process settings are a starting point for review, not automatic approval to use them.
Assess structural integrity, recoverable safety systems, key spare parts, energy and emission boundaries, and suitability for the new process. Inspect pushers, rollers, chains and hydraulics for wear, alignment and loaded movement.
These groups organise the evidence, not a universal operating sequence. Set the prerequisites, test order and necessary media or representative load for the actual equipment.
Check direction of rotation, travel, limits, valves, emergency stops, alarms, insulation and fail-safe actions under the conditions specified in the test plan. Record defects and corrective work.
Confirm that the lining, equipment state and process permit the planned heating test. Define required media and protective conditions; use a no-load trial only where suitable. Check temperature zones, circulation, furnace pressure, mechanisms and alarms under the approved conditions.
Fix and record the workpiece, loading arrangement, load, process curve, measurement method and result. Empty operation cannot replace loaded acceptance.
Archive as-built drawings, program and parameter backups, alarm lists, test records, training documents, spare-parts lists and the follow-up inspection plan.
First establish the shutdown reason and inspect insulation, lining, seals, energy piping, actuators, safety interlocks and mechanical condition. The verification plan must define the prerequisites, test order and required media; do not assume every furnace can be heated empty.
Use them as a starting point for review. Foundations, alignment, pipes, wiring, circulation, furnace pressure and measurement conditions may have changed and need verification at the new site.
Plan records recovery, inspection, repairs, installation, cold tests, no-load trials and loaded acceptance separately. Timing depends on equipment condition, scope, site conditions and the available shutdown window.
Based on Suneng’s existing Chinese engineering guide. Project examples retain their original design and acceptance limits. English content updated .
Discuss your project
Share the available information below. Mark anything unknown so it can be clarified during the technical discussion.