Measure the complete operating cycle
Record useful heat delivered to the workpiece, wall and exhaust losses, ventilation, idle operation and loading. Separate installed heating capacity from actual energy consumption over the measurement period.
Engineering guide
Compare energy options under the same production conditions and check whether recovered heat has a practical use.
Discuss Your RequirementsStart with a measured heat and energy balance for the existing process. Compare electric and fuel heating using the same workpiece, load, process curve and operating hours, then include utility upgrades, exhaust systems, safety, maintenance and downtime. Waste heat recovery also needs a usable heat demand that matches the available heat in temperature and timing.
Record useful heat delivered to the workpiece, wall and exhaust losses, ventilation, idle operation and loading. Separate installed heating capacity from actual energy consumption over the measurement period.
Include energy tariffs, electrical or fuel infrastructure, exhaust treatment, equipment changes, maintenance and production downtime. Electricity and fuel prices alone cannot determine the better option.
Review required heat input, burner arrangement, furnace pressure, exhaust, fuel supply and protective functions. Confirm that the furnace structure, foundations, atmosphere and site utilities suit the proposed conversion.
Assess electrical supply capacity, heating elements and zones, atmosphere, circulation and tariffs. This guide provides assessment questions; it does not present a verified Suneng fuel-to-electric conversion delivery.
Define fuel isolation, valve-state verification, mode interlocks and the purge and restart requirements in the approved project safety design. An air-side shutoff does not establish isolation of the fuel supply. These functions need documented verification by the responsible engineering team.
Measure exhaust temperature, flow and operating hours, including variations. Check dust, corrosion, pressure loss, maintenance access and the protective functions required by the equipment.
Assess combustion-air preheating or other process heating against the temperature and timing of the demand. A hot exhaust stream alone does not establish a worthwhile recovery project.
A 2020 electric-to-natural-gas trolley furnace proposal specifies a 13 × 7.4 × 4.3 m effective heating zone, a 700°C rated and maximum operating temperature, 14 temperature-control zones and fourteen 630 kW-class burners. The combined nominal burner capacity is 8,820 kW. These are proposal values, not measured energy consumption or proof of achieved savings.
Use the approved test plan to verify controls, protective functions and interfaces. Factory checks must be followed by site commissioning and loaded verification under the agreed process conditions.
Compare before-and-after consumption over equivalent loads, processes and operating periods. Agree the applicable emissions requirements and site measurement arrangements. Savings, payback and emissions performance require project evidence.
No. Compare the same production duty and include tariffs, infrastructure, safety systems, exhaust, maintenance and downtime. The answer depends on the project.
No. The fuel supply, valves, interlocks and verification method must be evaluated as part of the project safety design.
No. Flow, operating hours, contaminants, pressure loss and a suitable heat demand also affect feasibility.
Based on Suneng’s existing Chinese engineering guide. Project examples retain their original design and acceptance limits. English content updated .
Discuss your project
Share the available information below. Mark anything unknown so it can be clarified during the technical discussion.