Choosing a long gas cylinder curing furnace: size the trolley and chamber around the mandrel load

Published苏能工业炉工程技术团队&唐荔

The long cylinder curing furnace should be selected according to the "winded bottle body connected mandrel", and an extension furnace cannot be bought only according to the length of the bare bottle. For long gas cylinders that need multiple side-by-side, loading outside the furnace, and self-rotating during the curing process, if the site can accommodate the complete exit and loading and unloading operations of the furnace trolley, the overall furnace trolley scheme can be focused on comparing; if the space in front of the furnace is not enough, the combination of fixed workstations and special load transfer equipment should be compared, and the loading and unloading methods should be re-determined.

The discussion here is the resin curing equipment of fiber winding gas cylinders. The mandrel and the connecting parts at both ends will affect the loading, support and rotation configuration, and the selection conditions of metal inner tank solution treatment and aging equipment cannot be directly applyed.

Draw the cylinder and mandrel together before sizing the chamber

The purchase form only fills in the bottle length, bottle diameter and bottle weight, which is often not enough to determine the equipment. The actual entry into the furnace may include mandrel protruding ends, connectors, supports and drive interfaces; some of them need to enter the heating area, and others need to occupy the end installation space.

Three things should be distinguished on the loading diagram first: where the bottle that needs to be heated is, where the support at both ends is, and where the whole set of components passes when entering and leaving the furnace. The effective heating area, the furnace can be determined by the space and the total length of the furnace trolley are determined by these conditions respectively, and they cannot be regarded as the same size.

This will directly affect the choice of structure. If multiple bottle types only change the length of the bottle, and the support is consistent with the drive interface, priority can be given to comparing the adjustable scheme of the tail frame; if the mandrel shaft neck, end connection or support form also changes, it is not enough to increase the adjustment stroke, and the support or interface may also need to be replaced.

One way is to support the core shaft at both ends of the head frame and the tail frame, and let the tail frame be adjusted along the furnace trolley rail. It shows an adaptation method, which cannot be used to determine that all mandrels can be shared directly. When making an inquiry, you should provide the assembly drawing representing the bottle type with the mandrel, not just the shape drawing of the bottle.

Allow for loading and waiting outside a trolley furnace

The characteristic of the overall furnace trolley configuration is that the workstation support and rotation mechanism are arranged on the car, and the workpiece enters the furnace with the furnace trolley after the furnace is installed. For long gas cylinders, this can complete the head and tail position adjustment outside the furnace and maintain the established loading relationship into the furnace.

But there is a clear premise for choosing it: the factory can not only put the furnace body, but also accommodate the space required for the complete exit of the furnace trolley, the handover of the workpiece, and the normal loading, unloading and maintenance. There is an open space next to the furnace, which does not mean that the long furnace trolley has enough travel along the direction of entry and exit.

If this condition is not true, the arrangement of fixed workstations and furnace load transfer equipment should be compared, instead of buying bogie hearth furnace first, and then temporarily compressing the loading and unloading space. Changing the loading method will also change the furnace door, support handover, power supply connection and operation organization. You can't just delete the "fornace trolley" in the quotation.

It is also necessary to divide the three stages of loading, waiting and curing. If the confirmed resin process requires rotation when waiting before entering the furnace, it should be clear where the waiting takes place and which set of institutions should bear it. Whether the rotation drive is arranged on the furnace trolley depends on the actual process, and it is not a unified requirement for all gas cylinder curing furnaces.

When there is only one furnace trolley, it runs in the furnace with this batch of workpiece, and the next batch cannot occupy the same furnace trolley loading at the same time. If the production plan needs to prepare materials in advance, the preparation support, waiting method and its connection with the main furnace should be checked separately. The outer material outside the furnace should not be naturally understood as two batches in parallel.

Check supports, rotation and airflow when changing cylinder lengths

The tail frame can be moved to a new position, which only solves part of the length adaptation. After changing to another bottle body and mandrel combination, it is also necessary to confirm the support position, rotation connection, total weight and center of gravity, and whether it occupies the original hot air channel after adjustment.

For hot air circulation curing furnaces, the loading method will affect the path of air passing through the workpiece. The technical questions and answers of equipment manufacturers also pointed out that loading and blocking the airflow channel may slow down the heating. Therefore, it is not possible to judge whether it is feasible to increase the workstation only by "one can be stuffed into the furnace". Equipment manufacturer's instructions on loading and airflow

When comparing the configuration, you can use the following table together with the representative bottle type loading diagram:

Indication of the selection relationship of long gas cylinder curing furnace
How to judge the loading with mandrel. Conceptual indication, not proportional; only explain the selection relationship, do not represent the actual equipment structure, project shooting or operation method.
Products and production conditions The configuration of priority comparison Under what conditions the plan needs to be adjusted?
Long and short bottle types alternate, but the mandrel support is consistent with the drive interface. ADJUSTABLE TAIL FRAME AND CORRESPONDING POSITIONING METHOD When the interface and support form change, you can't just increase the itinerary.
Multiple long bottles are ready outside the furnace, and then the whole car is put into the furnace. Overall furnace trolley and on-car workstat mechanism When the front of the furnace cannot accommodate exit and loading and unloading, compare the fixed workstation and load transfer scheme.
The process requires waiting for the stage to turn. Waiting for the position to support the rotation mechanism and its connection Only configure the rotation inside the furnace, and cannot automatically cover the waiting outside the furnace.
Change the bottle diameter, the number of side-bys or the form of fixtures Corresponding to the support, spacing and hot air path under the loading combination It can be put down geometrically, but the temperature performance of the belt material still needs to be checked.
Single-piece trial production often interrupts mass production. Single-station trial equipment for independent control and recording When it is occasionally tested and the main furnace can be arranged, there is no need to automatically add a furnace.

The support, bearing and driving capacity here should be determined by the actual workpiece and fixtures data, and the table does not provide the general load or speed. Only when the selection is compared to this level can we judge which configurations can be shared and which need to be added, instead of converting all the differences into furnace length.

How a single-station trial oven fits the production plan

If the new bottle type, resin formula or curing procedure often requires a single test, the single-station trial furnace can arrange the program and record separately to reduce the scheduling conflict between the test task and the whole batch production of the main furnace. The premise is that the trial equipment can accommodate real long bottles and mandrels, and retain the support, rotation and temperature measurement conditions required for the test; the small sample oven cannot replace this task just by the same maximum temperature.

On the other hand, if the trial production frequency is very low, the existing main furnace can arrange the corresponding working conditions, and the new trial furnace may not be the first choice. We should also compare the footprint, power supply, exhaust and loading and unloading resources of new equipment, so as to avoid only counting the purchase price of the furnace.

The result of single-piece trial production cannot directly replace the confirmation of multiple loading of the main furnace. The loading density, hot air path and fixtures combination of the two are different, and mass production still needs to check the process records and product requirements under the planned loading conditions.

Before purchasing, the assembly drawing, total weight and support data, curing curve, waiting stage requirements, batch and trial arrangement, and on-site floor plan can be handed over to Jiangsu Suneng Industrial Furnace Co., Ltd. to judge the combination of the overall furnace trolley, fixed work station and trial equipment. The resin data and exhaust treatment interface should also be clear at the same time; if the process involves pressure control in the bottle, it should be confirmed according to the process, and the pressure setting or operation method should not be derived from the furnace body selection.