Track-shoe Press-quenching Line | Project Discussion Checklist Provide available information first; resolve unknowns during discussion. 1. Track-shoe model, material grade, preceding operations and incoming condition. 2. 2D/3D drawings, grouser and plate cross-sections, mass, mounting holes and measurement datums. 3. Final hardness, microstructure, crack inspection, flatness/twist/hole-spacing requirements and applicable specifications. 4. Existing heating, quenching and tempering schedules; historical distortion or nonconformity records. 5. Target parts/hour, shifts, usual model mix and die-change frequency. 6. Existing die, support/locating, clamping and cooling-structure information. 7. Site plan, press-foundation conditions, maintenance height, die lifting and access routes. 8. Electricity/gas, cooling, exhaust, upstream/downstream interfaces and supply responsibilities. 9. Representative models, test pieces and sample counts; separate equipment, process and product acceptance requirements. 10. Company, contact person and phone/WeChat/email. Verify process and equipment capability for the workpiece and adopted specification. This checklist assumes no universal pressure, temperature, medium or parts-per-hour capacity.